Skip to main content

Source register and authority

APPROVED · IMPLEMENTATION SPECIFICATION · London 0.1.0

Current source​

The pinned source manifest contains exact SHA-256 hashes and repository revisions for the canonical Porto sources reviewed. Those sources describe existing product/protocol intent, not evidence of this MVP running. Source authority: whitepaper for company/product intent; PIPs for their specified mechanisms; this approved directory for London-specific implementation departures.

SourceRelevant exact sectionsUse
Whitepaper§§3.2 System overview, 3.3 Revenue split, 4.2 chain, 6.2-6.5 streaming, 7.2 user-centric model, 8 Governance, 9 Phased RolloutIntent, trust transition and economic context
PIP-2System overview, Revenue split, Node roles, Phased rolloutOriginal network model
PIP-3§§1-7 token identity through staking interplayExplicitly excluded token mechanics
PIP-4§§1-8 streaming architecture through migrationEligibility and central trust context; London changes documented
PIP-5§§1-5 listener accrual through cost bounding; Security ConsiderationsListener attribution and rights split context
PIP-6§§1-5 node modes through Beta exemptionDistinguish delivery, attestation and validators
PIP-7§§1-4 governed parameters through migrationGovernance contrasts
RFC 8785§3 canonicalisation, Appendix D large integersCanonical signed and hashed bytes
Aptos transaction managementSequence, submission and recovery guidanceImplementation must pin and test actual SDK/framework semantics

External technical references inform implementation review; they are not provider agreements or proof of a deployed Porto integration. Pin actual framework/SDK/issuer asset references in L07 before Mainnet. Do not copy a native-USDC address from an example or assume any token named USDC is the approved asset.

Storage-engine references​

RocksDB Transactions documents TransactionDB and explicit read/write conflict protection. Basic Operations documents synchronous writes and process ownership. Backup guidance documents engine backup facilities. Porto's deterministic command protocol, single-owner policy, journal and migration boundary are approved design decisions specified in chapter 27, not capabilities supplied automatically by RocksDB.

Approval and supersession evidence​

On 22 September 2026 the product owner approved the reduced MVP after agreeing that it must retain artist/third-party-owned infrastructure and real peer participation. The owner requested this complete specification and status APPROVED. The new baseline supersedes the broader London draft, while preserving its navigable documentation structure. No supplied roadmap PDF was available in this authoring task, so none is cited as read or used.

This source register establishes where decisions came from. It does not establish implementation, regulatory status, licences, audits, deployment, real payments or observed demand. Those are captured separately in the release/pilot evidence record.

Contents · Implementation plan · Launch inputs