Skip to main content

Compatibility with existing Porto sources

APPROVED · IMPLEMENTATION SPECIFICATION · London 0.1.0

Status​

APPROVED FOR LONDON 0.1.0 describes this implementation baseline. CURRENT SOURCE describes the unchanged whitepaper/PIPs, which retain their own status and scope. London does not globally amend those sources. Their historical Beta/Mainnet names must not cause agents to reintroduce excluded systems.

Current source and exact sectionExisting descriptionLondon implementation rule
Whitepaper §§3.2, 4.2, 9; PIP-2 System overview / Phased rolloutPorto chain and staged network rolloutExisting Aptos Mainnet; no Porto consensus or chain implementation
PIP-3 §§1-7PRT issuance, reserve/redemption, oracle, gas and stakingNo PRT/customer crypto balance/redemption; company treasury funds native USDC
PIP-4 §1 Beta streaming architecturePorto trusted-region S3 and gateway servingPrivate Porto origin plus invited independently operated HTTPS nodes
PIP-4 §§2-3 Play validity / Session lifecycleThreshold, byte-based duration and heartbeatsRetain minimum threshold; use exact complete chunk durations; client heartbeats never monetary proof
PIP-4 §§4-6 On-chain schema / Batching / Trust modelStreamEvent batches and single trusted Beta signer, future quorumPrivate usage files plus public digest commitments; Porto acceptance within the backend; no separate attestor network
PIP-4 §7 Musical work registrationOn-chain work metadata/rightsPrivate versioned catalogue/rights included in accounting evidence
PIP-5 §§1-3 Listener accrual / Epoch settlement / Rights splitsPRT listener-attributed allocation and 70/25/5 splitFunded company-USDC period budgets; deterministic daily weights; production split is L04, not inherited by default
PIP-5 §2 rounding / §4 RedemptionDust treatment and token redemptionLargest remainder conserves every unit; ordinary USDC transfers; no redemption product
PIP-6 §§1-5 Node modes / Registration / Unbonding / Slashing / Beta exemptionNode/attestor duties and stake modelInvite-only delivery and peer cache transfer; no staking, slashing or validators
PIP-7 §§1-4 Registry / Upgrades / Beta governance / MigrationParameter governance and upgrade pathPrivate versioned release profile, immutable commitment code and controlled writer rotation
Whitepaper §6.5; PIP-4 §8Future decentralised attestation transitionDocument portability only; independent verification is future work

Canonical sources are pinned in source manifest and linked by section in source register. PIP-8 remains existing economic context; this revision makes no amendment to it and does not import its token flow into London.

Superseded London draft​

The previous draft's separate fraud/attestation boundaries, six Move modules, Merkle payout claims, automated dispute lifecycle and executable migration planning are replaced, not optional parallel implementation paths. Preserve daily accounting, private evidence, real USDC, permissioned delivery and proof boundaries. Existing route/file names remain stable where useful for links, even when their chapter title now reflects a smaller scope.

Storage decision supersession​

The approved RocksDB deterministic ledger supersedes PostgreSQL references in the preceding London revision. This is an internal implementation architecture change, not a canonical PIP amendment or a claim that RocksDB provides consensus. The engine, journal and portable state boundary are first-priority work; sovereign-chain deployment remains deferred.

Impact on messaging and design​

Public statements must distinguish approved specification, implemented software and observed pilot results. Do not relabel prototype node badges or simulated payouts as live because this document is approved. The approved pilot includes actual participant control and actual node-to-node transfer, but it does not demonstrate independent attestation, permissionless serving or Porto consensus.

Marketing, whitepaper and PIP changes require their own scoped edits and review. This task updates London and its knowledge representation; canonical source text is preserved. The design notes record the approved scope and human-facing state terminology, not a claim that the pilot has already run.

Contents · Implementation plan · Launch inputs